Floor Screed Drying Times. Thicker substrates will require 2 days per mm. Curing times can be as favourable as 24 days.
75mm screed drying time would be 110 days. How long does screed need to dry before tiling. Any screed floor must be properly cured before the addition of any flooring.
Any screed floor must be properly cured before the addition of any flooring.
Traditional Sand and Cement 13 14 mixes. A moisture test has to be conducted prior to beginning a floor preparation. Prior to the installation of a floor covering liquid screed must have dried to an approved level. Liquid Screed Fast Drying Cementitious Belitex 14-21 days.