Raising Concrete Floor Height. Level it off and let it set. 3 Adhere tile to concretesand mix with thinset.
Then hire a concrete mixer and start laying the stuff into the first frame. Use the flat side of the trowel to spread the mortar firmly against the concrete to achieve a good bond and then rake back across it with the notched side to leave ridges in the mortar. Discussion in Tilers Talk started by mark Newsham Sep 20 2017.
The floor was contiguous with our existing suspended timber floor but with no ventilation so all the wooden stuff was just skipped.
If this is your first visit be sure to check out the FAQ by clicking the link above. Reading the forum it seems like the right way to install cabinets is at the finished floor height not directly on top of the subfloor. Mark Newsham New Member. Use the flat side of the trowel to spread the mortar firmly against the concrete to achieve a good bond and then rake back across it with the notched side to leave ridges in the mortar.